AHU Replacement
Furnish all labor, materials, equipment and incidentals required to deliver and install aluminum doors, frames, panels and appurtenances. Removed HVAC equipment, hangers, controls, piping, insulation and associated items required by drawings to be removed.
Project Relevance
Palm Beach International Airport (PBIA) has nearly 200 daily non-stop arrivals and departures to nearly 30 destinations in the US, Canada and the Caribbean on 11 airlines. J.D. Power named PBIA the Best TSA Checkpoint in the U.S. and Airport Revenue News ranks PBIA in the top 5 Highest Ranked Airports for Ease and Accessing Parking and Getting to the Terminal.